Specification-led lining from drawing review through to reopened lanes — sequenced around surfacing cure and traffic management on your scheme.
-
Drawing register & brief We reconcile GA layouts, wording, symbols and restraint zones against your resurfacing programme and RAMS — highways, estates or decks.
-
Surface readiness We confirm curing windows, dryness and bond so thermoplastics, preformed layouts and high-friction details take without tape-and-hope rework.
-
Set-out & installation Hot-applied lines, stencil text and hatched bays are positioned to datum; studs, coloured surfacing approaches and deck lining follow the same disciplined set-out where they are in scope.
-
Snagging & handback We walk the finished markings with whoever holds the TMP or client brief, rectify snags and reopen carriageways or decks with photographic records where QA packs demand them.
Markings are delivered as part of coordinated surfacing handovers alongside our asphalt, yard and garage crews — single point of contact for programme questions.
